Created Created by Kind Comments
2026-04-01 23:14 admin Info

Moved from the staging rack to production after a 72-hour burn-in with no errors.

Toggle Dropdown
2026-02-07 11:15 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
Showing 1-2 of 2