Created Created by Kind Comments
2026-09-03 20:03 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
2026-06-06 18:55 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
2026-01-22 02:24 admin Info

Moved from the staging rack to production after a 72-hour burn-in with no errors.

Toggle Dropdown
Showing 1-3 of 3