Created Created by Kind Comments
2026-07-09 19:26 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
2026-05-05 05:16 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
2026-03-31 22:37 admin Info

Interface descriptions regenerated from NetBox cable records by the sync script.

Toggle Dropdown
Showing 1-3 of 3