Created Created by Kind Comments
2026-10-22 00:43 admin Success

Replacement PSU installed and tested. LibreNMS alert cleared.

Toggle Dropdown
2026-02-19 05:45 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
2026-02-03 05:54 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
Showing 1-3 of 3