Created Created by Kind Comments
2026-10-06 08:29 admin Info

Moved from the staging rack to production after a 72-hour burn-in with no errors.

Toggle Dropdown
2026-08-13 00:10 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
2026-04-25 23:44 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
Showing 1-3 of 3