Created Created by Kind Comments
2026-10-25 15:54 admin Info

Moved from the staging rack to production after a 72-hour burn-in with no errors.

Toggle Dropdown
2026-09-05 21:00 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
2026-07-08 07:43 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
Showing 1-3 of 3