Created Created by Kind Comments
2026-10-17 16:20 admin Success

Physical audit: serial number and rack position match NetBox. Asset label verified.

Toggle Dropdown
2026-04-07 00:39 admin Warning

PSU 2 reported a fault in LibreNMS. Replacement PSU ordered under the support contract.

Toggle Dropdown
2026-01-16 18:22 admin Info

Moved from the staging rack to production after a 72-hour burn-in with no errors.

Toggle Dropdown
Showing 1-3 of 3